STANDART STAND CONSTRUCTION

After submitting the contract application, the Participant must agree on the location of the stand in the pavilion and provide the layout of his stand.

For individual constructed stands, different from the standard one, the Participant must provide a plan of his stand. If the individual plan is not provided before the deadline specified in the contract application, the stand is mounted according to the standard scheme, and the claims for its design are not considered.

4 sq. м. 4
6 sq. м.
6
9 sq. м.
9
12 sq. м.
12  
15 sq. м.
15  
18 sq. м.
18